Areas Of Involvement

Infrastructures Projects

  •   Controlled blast design to excavate hard rock for the construction of underground station.
  •   Feasibility study for hard rock excavation by blasting under a concrete slab in Top Down method of excavation.
  •   Blasting near residential area and sensitive areas.