Hydroelectric Projects - Work Highlights
3D discontinuum Model of twin caverns with shear and fractured zone
Maximum Principal Stress distribution after complete excavation of a cavern
Minimum Principal Stress distribution after complete excavation of cavern
Geodetic Monitoring of the Dam
Direct Shear Test at a site in Hydroelectric Project
Plate Load Test in a Hydroelectric Project
Hydraulic Fracture Test in a Hydroelectric Project
Hydraulic Fracture Test in a Hydroelectric Project
The direction of maximum compression at various projects in Dibang valley
Mapped microseismic events around power house cavern in 3D view
Displacement contours computed from the data recorded during first year monitoring
DPR stage geological investigations for Bunakha hydroelectric project, Bhutan
Geological investigations of the MalshejGhat HEP reservoir rim area,Maharashtra
Microseismic signal due to cracking in the rockmass as recorded by five sensor stations at a hydroelectric project
Geological investigations of the MalshejGhat lower dam HEP catchment area, Maharashtra
Identification of re bole during geological investigations of the MalshejGhat upper dam HEP site, Maharashtra
Planning for the subsurface exploration during DPR stage of MalshejGhat upper dam HEP site, Maharashtra
Resistivity imaging section for HRT, Kumaradhara HEP, Karnataka
Seismic Tomography across river, Teesta Stage-III, Sikkim
Seismic Tomography across river at dam axis, Bunakha Hydel, Bhutan
Seismic refraction section for Upper Demwe Project (Detection of fault was later confirmed by drilling)
Seismic refraction section for Upper Demwe Project (Detection of fault was later confirmed by drilling)
P-Wave velocity tomogram below Koteshwar Dam